Key Features
- Open Standard Compliance: Designed to OCP ORv3 and OCP NIC 3.0/4.0 specifications
- 48V/52V Power Delivery: High-efficiency distribution architecture reduces power loss
- High Current Capacity: 60A to over 500A (bus bar applications)
- ±3mm Floating Connectors: Compensates for rack and tray mechanical misalignment
- Hot-Plug gable Serviceability: Optional sense pins for live insertion and removal
- Low Contact Resistance: <0.2 mΩ for bus bar connections, minimizing energy loss
- Flyover® Cable Architecture: Bypasses lossy PCB traces for longer reach at 112G/224G
- Fiber Optic Options: Single mode or multi mode for long-distance interconnects
- UL/Certified: UL 1977, UL 62368-1, UL 2875, TUV compliant
- Halogen-Free / ROHS: Environmentally friendly materials
Parameters
|
Parameter |
Specification |
|
Voltage Rating |
52V DC maximum (ORv3 power shelf), 1000V DC (bus bar) |
|
Current Rating |
360A , 500A |
|
Bus Bar Current |
Up to 1000A+ |
|
Dielectric Withstand |
1000V AC / 1500V (Hi-Pot) |
|
Contact Resistance |
<0.2 mΩ (bus bar) |
|
Operating Temp (cable) |
-40°C to +70°C |
|
Insertion Force (max) |
120N (power shelf), 100N (IT gear) |
|
Withdrawal Force (min) |
15N (power shelf), 12N (IT gear) |
|
Contact Material |
High-conductivity copper alloy with silver plating |
|
Mating Cycles |
≥50 cycles |
|
Wire Gauge |
16 AWG to 8 AWG (AC whip) |
|
Standard Length |
3m, custom lengths available |
Product Selling Points
1. ORv3 Compatible - The Open Rack v3 Standard
Open Rack version 3 (ORv3) moves data center power distribution from 12V to 48V/52V, significantly reducing I²R power losses and copper bus bar costs. This cable assembly is designed specifically to ORv3 specifications, ensuring compatibility with OCP-certified racks, power shelves, and IT trays. Benefit: Future-proof your data center infrastructure with open, non-proprietary components.
2. High-Current Capacity - 360A to 1000A+
Standard server power cables are rated for 10-20A. OCP power cables are engineered for rack-level distribution, handling 360A in still air and up to 500A with airflow. Bus bar connections support 1000A+ for entire rack clusters. Benefit: One cable replaces multiple traditional PSU whips, simplifying rack cabling and improving airflow.
3. Flyover® Cabling for 112G/224G Signal Integrity
Traditional PCB traces introduce significant loss at 56G and above. Flyover® copper cable assemblies bypass the motherboard entirely, running directly from chip to chip or chip to front panel connector. Benefit: Achieve longer channel reaches (up to multiple meters) compared to PCB-only routing at 112G PAM4.
4. ±3mm Floating Connector - Misalignment Tolerance
ORv3 racks have mechanical tolerances between the power shelf and the IT tray, especially in mass-produced environments. The floating connector design allows ±3mm movement in X and Y axes while maintaining electrical contact. Benefit: Reduced assembly time and no need for precision rack alignment.
5. Active Optical Options for Rack-to-Rack Links
For distances beyond 3m or between adjacent racks, active optical OCP cables convert electrical signals to light, achieving zero EMI susceptibility and consistent loss at any length. Benefit: Extend high-speed interconnects across rows without signal repeaters
Customization Options
- Application: Power (ORv3) or high-speed data (Flyover®)
- Connector Gender: Plug, receptacle, or bus bar clip
- Cable Length: Custom from 0.5m to 10m (copper) / up to 100m (optical)
- Wire Gauge (Power): 16 AWG to 8 AWG / bus bar thickness
- Floating Tolerance: ±3mm standard, custom available
- Keying Options: Polarized or color-coded to prevent mis-mating
- Material: Standard tin-plated copper or silver-plated (higher conductivity)
- Packaging: Poly bag, anti-static bag, or custom reel

Applications
- ORv3 power shelf to IT tray: 52V DC distribution (360A-500A)
- Bus bar connection: Battery backup unit (BBU) to rack power plane (1000A+)
- AC whip to PSU: 3m AC cable from rack PDU to ORv3 power supply
- Chip-to-front panel I/O: 112G/224G PAM4 using Flyover® coppe

Star Reviews From Customers
1.Mike R., Hyper scale Power Lead in Texas
"Deployed 50 racks with ORv3. These 52V power cables from the shelf to the IT trays carry 400A continuous. The floating connectors are forgiving - techs don't need micrometer perfect alignment. Drop-in fit. Bus bar clips maintain <0.2 mΩ even after multiple insertion cycles."
2.Jessie L., Data Center Architect in Virginia
"Switch backplane needed 112G PAM4 ports. Standard PCB trace length limited reach to 12 inches. Flyover® cable assembly gave us 2m reach to the front panel. Consistent SI traces across 1000 units. This should be standard in OCP designs."
3.Sarah K., AI Network Architect in New York
"GPU cluster interconnect. 112G PAM4 chip-to-front panel cables. The 0.9mm pitch high-density connectors gave us 64 lanes per ASIC. Used active optical OCP cable for cross-rack GPU traffic - zero EYE closure at 10m length. Cabling matches OCP NIC 4.0 footprint."
4.Dave P., Rack Integration Manager in Florida
"Mixed vendor ORv3 environment (power shelf from one OEM, IT trays from another). These standardized 52V cables work across both. Floating connector compensated for 2.5mm misalignment in the third-party rack. Less rework, faster deployment."
5.Priya K., Open Compute Contributor in India
"OCP cable spec ensures interoperability. We sourced cable assemblies from different manufacturers - all mated with our ORv3 backplane without modification. The ±3mm float and clear polarization color coding reduced training time for new rack technicians."
FAQ
Q1: DO YOU HAVE A CATALOGUE? CAN YOU SEND ME YOUR PRODUCT CATA-LOGUE SO THAT I CAN CHOOSE SOME PRODUCTS WHICH I NEED?
A1: Yes,you contact us online or send an Email and let us know what kinds of products such as type C connectors, DVI connectors, box header, RJ45etc you need so that we can send them to you respectively.
Q2: CAN YOU BUILD THEM FOR ME IF I CAN'T FIND THE PRODUCT ON YOUR CAT-ALOGUE OR STORE ON WEBSTE?
A2: Our catalogue shows most of our products but not all, please let us know what you want or provide your drawing or product information to us no matter what customization for product, packing or logo, we can offer ODM service.
Q3: CAN YOU PROVIDE SAMPLES FOR FREE?
A3: Usually we can provide a few of samples to you for free if we have some in stock but you need to pay express fee.
Q4: WHAT ABOUT YOUR DELIVERY TIME?
A4: 1-3day for products in stock, 3-20 days for connectors, 7-30 days for cable assembly,large quantity and customized products need to be negotiated.
Company Profile
Production Lines And Inspection Equipments

Our Certificates

Payment Method
- Payment method: Credit card or T/T (optional for large amounts). Western Union PayPal
- T/T payment generally supports 100% advance payment.
- Lead time: Normally in 5-10 working days after payment received.
- Sample policy: Samples are always available for each model for standard products.
- Samples can be ready in 3-5 working days once payment received.
- Shipping port: Shenzhen, China.

Logistics/packaging

Hot Tags: ocp cable, China ocp cable manufacturers, suppliers, factory